Night power emergency repairs originally required the assistance of lighting vehicles, such as raising the lighting lights or installing fixed lighting in advance, which was labor-intensive and limited in the lighting range and height. With the widespread promotion of high-speed rail, construction and maintenance along the line must be arranged after 12 pm. After using lighting drones, the brightness is sufficient, the range is large, and high altitude side lighting can be achieved, which is highly praised by customers. At present, the procurement of the power sector is also actively being promoted.